WARNING: Always load the PowerLoader on level ground. Last, replace the two 2” Quick Clip pins and the load is secure and ready to be transported. Note: Do not reel in winch cable too tight as damage will result to the PowerLoader frame voiding the warranty. Next, continue to reel in the winch cable until the load is nearly in the upright position (see Fig. When the cargo platform telescopes in fully and is parallel to the ground, replace the two 3” Quick Clip pins (see Fig. This article is within the scope of WikiProject Lists, an attempt to structure and organize all list pages on Wikipedia.If you wish to help, please visit the project page, where you can join the project and/or contribute to the discussion. Bring the winch cable down to the hook buckle and attach cable (see Fig. First, reel out enough winch cable to pass over both the fairlead rollers. Next, set the load on the cargo platform and secure with the two straps that are provided (see Fig. The Power Loader can be adjusted to fit most ATVs/UTVs. Note: if adjustments are needed to fit horizontal arms to the rack, use the four nylon spacers or the mounting brackets can be moved to the inside of the vertical braces on the Power Loader. Secure to the front rack with the U-Bolts provided (see Fig. Place the two horizontal arms on ATV/UTV front rack and slide the PowerLoader towards the ATV/UTV until it touches the front of the ATV/UTV. Start with the left mounting bracket and attach it to the left vertical brace of the PowerLoader facing the angle to the outside of the vertical brace (see Fig. This will allow attachment of mounting brackets to the vertical brace on the Power Loader (see Fig. Remove the two 2” Quick Clip pins and fold the Power Loader out. This airship allows transporting a pay-load of 160t over a distance of up to 10’000 km with a speed of 80-120 km/h. INSTRUCTIONS FOR INSTALLATION AND USE STEP 1: Find a clean flat surface to work on and assemble the mounting brackets to the PowerLoader. Contents: 1 - PowerLoader, 2 - Mounting brackets, 4 - ¼” U-Bolts w/ brackets, 16 - Metal Washers 8 - Lock nuts, 4 - ¼” X 2 ½” Bolts, 4 - Nylon spacers*, 2 - Load-securing straps, 4 - ¼” Wing knobs *Note: The four Nylon spacers may be used to make minor adjustments to better fit the Power Loader to the ATV/UTV front rack. This of course requires write access and this is the way to limit. Those are: CargoLifter uses access tokens for interacting with the backend. Instead of having it's own auth mechanism it uses existing source control providers logins. The PowerLoader MODEL PL250 READ ALL INSTRUCTIONS BEFORE USING THE POWERLOADER NOTE: Failure to read instructions before use could result in injury or death. This project offers an implementation of an alternate registry.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |